sli
Bank of B/CS
Date 10/11/2023
*Bids Due November 23, 2022 By 5pm*
Please send all bids or questions to Karen Shaide
Office (713) 932-3123
kshaide@sligroup.com

Contractor Safety Information

Instructions to Bidders

Bullitens
Date Added
Transmittal
Bulletin
2/22/2023
 
Bulletin
2/22/2023
Transmittal_Bulletin 2_8898_Bank of Brenham_BCS
Bulletin
2/22/2023
Transmittal_Bulletin 3_8898_Bank of Brenham_BCS
Bulletin
2/22/2023
Transmittal_Bulletin 4_8898_Bank of Brenham_BCS
Bulletin
3/7/2023
Transmittal_Bulletin 5_8898_Bank of Brenham_BCS
Bulletin
3/7/2023
Transmittal_Bulletin 6_8898_Bank of Brenham_BCS
Bulletin
3/14/2023
Transmittal_Bulletin 7_8898_Bank of Brenham_BCS
Bulletin
3/14/2023
Transmittal_Bulletin 8_8898_Bank of Brenham_BCS
Bulletin
3/22/2023
Transmittal_Bulletin 9_8898_Bank of Brenham_BCS
Bulletin
4/14/2023
Transmittal_Bulletin 10_8898_Bank of Brenham_BCS
Bulletin
4/17/2023
Transmittal_Bulletin 11_8898_Bank of Brenham_BCS
Bulletin
8/1/2023
Transmittal_Bulletin 12_8898_Bank of Brenham_BCS
Bulletin
9/22/2023
Transmittal_Bulletin 13_8898_Bank of Brenham_BCS
Bulletin
10/3/2023
Transmittal_Bulletin 14_8898_Bank of Brenham_BCS
Bulletin
10/6/2023
Transmittal_Bulletin 15_8898_Bank of Brenham_BCS
Bulletin
10/11/2023
Transmittal_Bulletin 16_8898_Bank of Brenham_BCS
Bulletin
11/2/2023
Transmittal_Bulletin 17_8898_Bank of Brenham_BCS

 

Sheet #
Drawing Title
Revision Date
File Name
Notes
 
FULL SET
FULL
FULL SET OF DRAWINGS
11/14/2022
FULL IFC SET
 
GENERAL
G-1.00
TITLE SHEET
11/22/2022
001_G100_8898_230125_bulletin 3
G-1.01
LIFE SAFETY PLAN - FIRST FLOOR
11/22/2022
002_G101_8898_230125_bulletin 3
G-1.02
LIFE SAFETY PLAN - SECOND FLOOR
11/22/2022
003_G102_8898_230125_bulletin 3
G-1.03
LIFE SAFETY - FIRE LANE ACCESS
2/22/2023
004_G103_8898_230106_IFC
G-1.04
TEXAS ACCESSIBILITY COMPLIANCE
11/22/2022
002_G104_8898_230106_bulletin1
G-1.05
TEXAS ACCESSIBILITY COMPLIANCE
11/22/2022
003_G105_8898_230106_bulletin1
G-1.06
U.L. FIRE RATINGS
3/7//2023
001_G106_8898_230216
G-1.07
ENERGY CODE COMPLIANCE
3/7//2023
002_G107_8898_230216
CIVIL
C0.0 
COVER SHEET
11/14/2022
009_C000_8898_230106_IFC
C0.1 
COVER SHEET
11/14/2022
010_C001_8898_230106_IFC
C1.0 
GENERAL NOTES
11/14/2022
011_C100_8898_230106_IFC
C1.1 
CITY SITE PLAN
11/14/2022
012_C110_8898_230106_IFC
C1.2 
CITY SITE PLAN/FIRE PROTECTION
11/14/2022
013_C120_8898_230106_IFC
C2.0 
DEMOLITION PLAN
11/14/2022
014_C200_8898_230106_IFC
C3.0 
EROSION CONTROL PLAN
11/14/2022
015_C300_8898_230106_IFC
C4.0 
PAVING PLAN
11/14/2022
006_C400_8898_230106_bulletin1
C5.0 
GRADING AND DRAINAGE PLAN
11/14/2022
C5.0 - GRADING PLAN
C5.1 
STORM PLAN
11/14/2022
018_C510_8898_230106_IFC
C6.0 
UTILITY PLAN
11/14/2022
019_C600_8898_230106_IFC
C7.0 
GENERAL DETAILS
11/14/2022
020_C700_8898_230106_IFC
C7.1 
GENERAL DETAILS
11/14/2022
021_C710_8898_230106_IFC
C7.2 
GENERAL DETAILS
11/14/2022
022_C720_8898_230106_IFC
C7.3 
GENERAL DETAILS
11/14/2022
023_C730_8898_230106_IFC
S1 
B/CS STANDARD SEWER DETAILS
11/14/2022
024_S1_8898_221114_IFC
S2 
B/CS STANDARD SEWER DETAILS
11/14/2022
025_S2_8898_221114_IFC
ST
B/CS STANDARD STREET DETAILS
11/14/2022
026_ST_8898_221114_IFC
D
B/CS STANDARD DRAINAGE DETAILS
11/14/2022
027_D_8898_221114_IFC
SW
B/CS STANDARD SIDEWALK DETAILS
11/14/2022
028_SW_8898_221114_IFC
SWPPP 
B/CS STANDARD SWPPP DETAILS
11/14/2022
029_SWPP_8898_221114_IFC
W1 
B/CS STANDARD WATER DETAILS
11/14/2022
030_W1_8898_221114_IFC
W2 
B/CS STANDARD WATER DETAILS
11/14/2022
031_W2_8898_221114_IFC
LP1.00 
LANDSCAPE PLAN
11/14/2022
007_LP100_8898_230106_bulletin1
LP2.00 
LANDSCAPE DETAILS
11/14/2022
033_LP200_8898_230106_IFC
SP-1.00 
ARCHITECTURAL SITE PLAN
11/14/2022
008_SP100_8898_230106_bulletin1
SP-1.10
SITE PLAN DETAILS
11/14/2022
Bank of BCS_SP-1.10
SP-1.11
SITE PLAN DETAILS
2/22/2023
004_SP111_8898_230125_bulletin 3
ARCHITECTURAL
A-0.00 
ACCESSIBILITY ROUTE COMPLIANCE
11/14/2022
028_a000_8898_221114
A-0.10 
ACCESIBILITY ELEMENT COMPLIANCE
11/14/2022
029_a010_8898_221114
A-1.01 
DIMENSION PLAN - FIRST FLOOR
11/14/2022
Bank of BCS_A-1.01
A-1.02 
DIMENSION PLAN - SECOND FLOOR
11/14/2022
Bank of BCS_A1.02
A-1.10 
FLOOR PLAN-FIRST FLOOR
3/7//2023
Bank of BCS_A-1.10
A-1.20 
FLOOR PLAN-SECOND FLOOR
11/14/2022
Bank of BCS_A-1.20
A-1.21 
ENLARGED PLAN DETAILS
11/14/2022
015_A121_8898_230106_bulletin1
A-1.22 
ENLARGED FLOOR PLANS
22/2/2023
016_A122_8898_230106_bulletin1
A-2.00 
DOOR SCHEDULE
11/14/2022
Bank of BCS_A-2.00
A-2.10 
WINDOW SCHEDULE
11/14/2022
Bank of BCS_A-2.10
A-3.00 
INTERIOR PARTITIONS
3/7//2023
Bank of BCS_A-3.00
A-3.01 
INTERIOR PARTITIONS
3/7//2023
005_A301_8898_230216
A-4.00
RCP-FIRST FLOOR
11/22/2022
Bank of BCS_A-4.00
A-4.10
RCP-SECOND FLOOR
11/14/2022
Bank of BCS_A-4.10
A-5.00 
ROOF PLAN
11/22/2022
018_A500_8898_230106_bulletin1
A-6.00 
EXTERIOR BUILDING ELEVATIONS
11/14/2022
Bank of BCS_A-6.00
A-6.10 
EXTERIOR BUILDING ELEVATIONS
11/14/2022
Bank of BCS_A-6.10
A-6.11
EXTERIOR BUILDING ELEVATIONS
3/7//2023
006_A611_8898_230216
A-7.00 
BUILDING SECTIONS
11/22/2022
022_A700_8898_230106_bulletin1
A-7.10 
BUILDING SECTIONS
11/22/2022
023_A710_8898_230106_bulletin1
A-7.20 
BUILDING SECTIONS
11/14/2022
024_A720_8898_230106_bulletin1
A-7.30 
BUILDING SECTIONS
11/14/2022
072_A730_8898_230106_IFC
A-7.40 
BUILDING SECTIONS
11/14/2022
073_A740_8898_230106_IFC
A-7.50 
BUILDING SECTIONS
11/22/2022
074_A750_8898_230106_IFC
A-7.60 
BUILDING SECTIONS
11/22/2022
075_A760_8898_230106_IFC
A-8.00 
WALL SECTIONS
11/14/2022
Bank of BCS_A-8.00
A-8.01 
WALL SECTIONS
11/14/2022
026_A801_8898_230106_bulletin1
A-8.02
VERTICAL PLANS AND SECTIONS
22/2/2023
010_A802_8898_230125_bulletin 3
A-8.03
STAIR DETAILS
22/2/23
011_A803_8898_230125_bulletin 3
A-9.00 
ENLARGED WALL SECTION DETAILS
11/14/2022
Bank of BCS_A9.00
A-10.00 
INTERIOR ELEVATIONS
11/14/2022
Bank of BCS_A-10.00
A-10.01 
INTERIOR ELEVATIONS
11/22/2022
014_A1001_8898_230106_bulletin 3
A-10.02 
INTERIOR ELEVATIONS
11/14/2022
Bank of BCS_A-10.02
A-11.00 
MILLWORK DETAILS
11/14/2022
084_A1100_8898_230106_IFC
A-12.00 
FINISHED FLOOR PLAN
11/14/2022
Bank of BCS_A-12.00
A-12.02 
RESTROOM ACCESSORIES
11/14/2022
086_A1202_8898_230106_IFC
A-12.03 
FURNITURE PLAN - FIRST FLOOR
11/14/2022
Bank of BCS_A-12.03
A-12.04 
FURNITURE PLAN - SECOND FLOOR
11/14/2022
Bank of BCS_A-12.04
A-13.00 
POWER PLAN-1ST FLOOR
11/14/2022
Bank of BCS_A-13.00
A-13.01 
POWER PLAN- 2ND FLOOR
11/14/2022
Bank of BCS_A-13.01
 
A-14.00 
INTERIOR SIGNAGE
11/14/2022
033_A1400_8898_230106_bulletin1
STRUCTURAL
S0.00
GENERAL NOTES
11/14/2022
034_S000_8898_230106_bulletin1
S0.01
GENERAL NOTES
11/14/2022
035_S001_8898_230120_IFC
S0.02
GENERAL NOTES
11/14/2022
036_S002_8898_230120_IFC
S0.03
TYPICAL FOUNDATION DETAILS
11/14/2022
035_S003_8898_230106_bulletin1
S0.04
TYPICAL FRAMING DETAILS
11/14/2022
038_S004_8898_230120_IFC
S0.05
TYPICAL FRAMING DETAILS
11/14/2022
039_S005_8898_230120_IFC
S0.06
TYPICAL FRAMING DETAILS
11/14/2022
040_S006_8898_230120_IFC
S0.07
TYPICAL FRAMING DETAILS
11/14/2022
041_S007_8898_230120_IFC
S1.01
FOUNDATION PLAN
11/14/2022
2221151 Bank of BCS Bryan Struct Bulletin No. 2 2023-01-23
S2.01 
SECOND FLOOR FRAMING PLAN
11/14/2022
043_S201_8898_230120_IFC
S3.01 
ROOF FRAMING PLAN
11/14/2022
044_S301_8898_230120_IFC
S4.01
FOUNDATION DETAILS
11/14/2022
045_S401_8898_230120_IFC
S4.02 
FOUNDATION DETAILS
11/14/2022
046_S402_8898_230120_IFC
S5.01
FLOOR FRAMING DETAILS
11/14/2022
047_S501_8898_230120_IFC
S5.02
FLOOR FRAMING DETAILS
11/14/2022
048_S502_8898_230120_IFC
S6.01
ROOF FRAMING DETAILS
11/14/2022
037_S601_8898_230106_bulletin1
S6.02
ROOF FRAMING DETAILS
11/14/2022
050_S602_8898_230120_IFC
MECHANICAL/ELECTRICAL/PLUMBING
M1.01 
MECHANICAL PLAN, LEVEL 1
11/14/2022
M1.01 - MECHANICAL PLAN - LEVEL 1
M1.02 
MECHANICAL PLAN, LEVEL 2
11/14/2022
M1.02 - MECHANICAL PLAN - LEVEL 2
M1.03 
MECHANICAL PLAN, ROOF
11/14/2022
040_M103_8898_230106_bulletin1
M3.01 
MECHANICAL DETAILS
11/14/2022
041_M301_8898_230106_bulletin1
M3.02 
MECHANICAL SCHEDULES
11/14/2022
M3.02 - MECHANICAL SCHEDULES
M3.03 
MECHANICAL DETAILS
11/14/2022
105_M303_8898_230106_IFC
E0.01 
ELECTRICAL SITE PLAN
11/14/2022
106_E001_8898_230106_IFC
EP1.01 
ELECTRICAL POWER PLAN, LEVEL 1
11/14/2022
EP1.01 - ELECTRICAL POWER PLAN - LEVEL 1
EP1.02 
ELECTRICAL POWER PLAN, LEVEL 2
11/14/2022
EP1.02 - ELECTRICAL POWER PLAN - LEVEL 2
EP1.03 
ELECTRICAL POWER PLAN, ROOF LEVEL
11/14/2022
EP1.03 - ELECTRICAL POWER ROOF PLAN
EL1.01 
ELECTRICAL LIGHTING PLAN, LEVEL 1
11/14/2022
EL1.01 - ELECTRICAL LIGHTING PLAN - LEVEL 1
EL1.02 
ELECTRICAL LIGHTING PLAN, LEVEL 2
11/14/2022
EL1.02 - ELECTRICAL LIGHTING PLAN - LEVEL 2
E0.01
ELECTRICAL SITE PLAN
3/14/2023
E0.01 - ELECTRICAL SITE PLAN
E3.01 
ELECTRICAL DETAILS
11/14/2022
045_E301_8898_230106_bulletin1
E3.02 
ELECTRICAL DETAILS
11/14/2022
046_E302_8898_230106_bulletin1
E3.03 
ELECTRICAL DETAILS
11/14/2022
E3.03 - ELECTRICAL DETAILS
FA1.01
FIRE ALARM PLAN, LEVEL 1
11/14/2022
115_FA101_8898_230106_IFC
FA1.02 
FIRE ALARM PLAN, LEVEL 2
11/14/2022
FA1.02 - FIRE ALARM PLAN - LEVEL 2
P1.00 
PLUMBING PLAN, UNDER SLAB
11/14/2022
038_P100_8898_230106_bulletin1
P1.01 
PLUMBING PLAN, LEVEL 1
11/14/2022

 

P1.01 - PLUMBING PLAN - LEVEL 1

P1.02 
PLUMBING PLAN, LEVEL 2
11/14/2022

 

P1.02 - PLUMBING PLAN - LEVEL 2

P1.03 
PLUMBING PLAN, ROOF LEVEL
11/14/2022
P1.03 - PLUMBING PLAN - ROOF
P3.01
PLUMBING SCHEDULES
11/14/2022
P3.01 - PLUMBING SCHEDULES
P3.02 
PLUMBING DETAILS
11/14/2022
097_P302_8898_230106_IFC
P3.03 
PLUMBING DETAILS
11/14/2022
098_P303_8898_230106_IFC
P3.04 
PLUMBING RISER DIAGRAMS
11/14/2022
P3.04 - PLUMBING RISER DIAGRAMS
GEOTECH
GTR
GEOTECH REPORT
06/08/2022
43-2645 - Bank of BCS Geotech

 

The information, ideas, designs, details, layouts, techniques, features, arrangements, plans, sequences, dimensions, allowances, tolerances, conceptions, specifications, intentions, technology or embodiments, as illustrated, arranged, displayed, noted, recorded, indicated, represented, disclosed, evidenced, detailed or otherwise reduced to tangible form hereon, either expressly, inherently or by implication, are the confidential and proprietary information of SLI Design, Inc., and shall not be used for any purpose other than the specific project or undertaking identified on the drawing title block or legend for which they are and have been prepared by SLI Design, Inc. Any other reproduction, disclosure or use of any portion of the confidential and proprietary information of SLI Design, Inc., shall be a breach of the obligation of confidence created by the acceptance of this drawing from SLI Design, Inc. for a specific project or Contract. Any copying, duplicating, reproducing, utilization, alteration, modification, revision or change to this drawing, is expressly prohibited unless done with the prior written consent or approval of SLI Design, Inc., and shall not be undertaken without receipt of such prior written approval. This drawing is loaned by SLI Design, Inc., for the limited purpose of complying with a specific Contract.  The drawing remains the property of SLI Design, Inc., and shall be returned upon request or completion of the contract, unless specifically authorized by Contract, under which it was loaned.